Pars

Ethane recovery and styrene monomer plants 
Product 能 力
  千トン

Ethane

1,600

ethylbenzene

645

Styrene

600

PS

250

Benzene

6

Toluene

14

Propane

980

Buthane

570

Mixed C5+

86

所有:100 % NPC
運営:Pars Petrochemical Company(Private Joint Stock)
立地:Pars Special economic / Energy Zone
生産開始:2004-2005

 

 

Olefin No.9

Product 能 力
  千トン

Ethylene

1,400

MD/HDPE

300

LDPE

300

C3+

90

所有:NPC 50% ,Sasol Polymers of South Africa 50%
運営:Arya Sasol Polymer Co.(Private Joint Stock)
立地:Pars Special economic / Energy Zone
生産開始:2005

President to inaugurate Arya Sasol Petrochemical Complex soon

Sasol to divest stake in Iran petchem

Sasol、イランの石化JV Arya (Olefin No.9) 持分をようやく売却
  売却先:Main Street 1095 (Pty) Limited, a South African subsidiary of an Iranian investor
   

Olefin No.10

Product 能 力
  千トン

Ethylene

1,540

Propylene

340

LLDPE/HDPE

300

HDPE

300

Polypropylene

300

Ethylene glycols

443

Alfa Olefins

368

Raw Pyrolysis Gasoline

216

Fuel Oil

40

Butadiene 1&3

64

Cracked gazoline

4

ABS

200

所有:NPC (49%) , Social Security Organization (26%) ,Retirement Organization (25%)
運営:Jam Petrochemical Co(Private Joint Stock)
立地:Pars Special economic / Energy Zone
生産開始:2004-2005

Jam Petrochemical Complexs 10th olefin project inaugurated

-----

Jam Expansion Project

Implemented by: Jam Petrochemical Co.(Private Joint Stock)

Projected production date: 2011 (Butene -1),
 2012(SBS/SB/LCBR&ABS)

  Inter-
mediate
Final
*Butene -1   100
SBS/SB/LCBR 60 30
**ABS   200
Alfa olefins 200 168

Butene-1 unit is being implemented by a consortium of Jam Petrochemical Co. (40%) & Petrochemical Downstream Industries Developement Co. (60%).
**To be implemented in site no. 2. of Pars Special Economic / Energy Zone (in Styrene Park)

 

Polystyrene Park

Implemented by: Holding Co. (Private Sector)
Ownership: Private Sector (100%)

Projected production date: 2014

ABS*   200
SBS/SB/LCBR* 60
ESBR 100
EPS 120

* Considered as expansion projects of Jam Petrochemical Co.

Olefin No.11                

Product 能 力
  千トン
Phase 2

Ethylene

1,200

2,000

HDPE

300

 

LLDPE/HDPE

300

 

buten-1

50

 

monoethylene glycol

700

 

styrene monomer

600

 

    運営:Kavian Petrochemical Co
         
NPC (17.7%), Bakhtar (50%), Gachsaran (6.5%), Lorestan (6.5%), Kermanshah Polymer (6.5%),
          Kordestan (6.5%) and Mahabad (6.5%).
    立地:
Pars Special economic / Energy Zone

-----

11th Olefin (Phase 2)

Implemented by: Kavyan Petrochemical Co. (Private Joint Stock)

Projected production date: 2011

Ethylene 2,000 当初案 No.2 1,200
C3+   180  


    

Olefin No. 12 

Product 当初計画 最終

Ethylene

1,900

1,200

LLDPE/HDPE

300

 

MEG

660

 

DEG

70

 

Polypropylene

300

 

Benzene

388

382

Toluen

196

 

mixed Xylene

128

 
Paraxylene
  528
Orthoxylene   90

Propylene

外販
545

327
C4 cut   294

Butadiene

277

 

Fuel gas

752

 

Fuel oil

979

26
Heavy ends   1,089
Heavy aromatics   25

     ↓

downsizes
  
600,000 tpa ethylene
  350,000 tpa propylene
  no polyolefins

     ↓

立地:Pars Special economic / Energy Zone

Implemented by: Bushehr Petrochemical Co.(Private Joint Stock)
Ownership: NPC (100%)

Projected production date: 2014

能力 上記

 

Bushehr Petrochemical   

  能 力
  千トン
ethane   850
ethylene   670
methanol  1,970

ーーー

Phase2 −Ethan/ethylene/Methanol Extraction

Implemented by: Bushehr Petrochemical Co.
Ownership: NPC (100%)

Projected production date: 2013

  Inter-
mediate
Final
Ethane 2,200 900
Ethylene   1,000
C3+ cuts   88
Methanol   1,650
Propane   478
Butane   90
Light gas   89 mm3/d
C5+ cuts   5

 

Fourth Aromatics

Product 能 力
  千トン

Benzene

430

Paraxylene

750

Orthoxylene

100

Light ends

680

Heavy ends

 2,000

Raffinate

380

Heavy Aromatics

16

LPG

76

C5 +

47

所有:100 % NPC
運営:Borzuyeh Petrochemical Company(private Joint Stock)
立地:Pars Special economic / Energy Zone
生産開始:2007

Fourth Methanol

Product 能 力
  千トン
Methanol   1,650

所有:100 % NPC
運営:Zagros Petrochemical Co.(private Joint Stock)
立地:Pars Special economic / Energy Zone
生産開始:2004

DME

Product 能 力
  千トン

dimethyl ether

  880

運営:Zagros Petrochemical Co.
立地:Pars Special economic / Energy Zone

Assaluyeh Ammonia/Urea            

Product 第1期
能 力

  千トン
第2期
能 力
千トン  トン/日

Ammonia

680

680  2,050

Urea

 1,075

1,075 3,250

Implemented by Ghadir Petrochemical Co.
運営:Petrochemical Industries Development Management CO. (PIDMCO)
           (Private Joint Stock)
立地:Pars Special economic / Energy Zone
生産開始:2004

    第二期 TEC・千代田化工が受注  完成

---

6th Ammonia/Urea

Implemented by: Petrochemical Industries Development Management Company
Ownership: NPC (48%), Ghadir Investment Co. (51%), Iran Petrochemical Commercial Co. (1%)

Projected production date: 2010*
*(Urea unit :Currently at commissioning stage)
(Ammonia unit: came on stream in 2010)

  Inter-
mediate
Final
Ammonia 680 75
Granular urea -  1,075

 

GTL-1

50,000 b/d of gas oil, naphtha and LPG for phase 1.
Overall production at the end of phase 2 will reach 110,000 b/d

所有:NPC 50%, Sasol Polymers 50%
運営:NPC International, Sasol Polymers
立地:Petrochemical Special Economic Zone
生産開始:2007(1st phase)

 

Assaluyeh Ethylene Glycol 

Implemented by:Morvarid Petrochemical Co.(Private Joint Stock)
Ownership: NPC (100%)

Projected production date: 2011
* The project was transferred from Kharg Island to Assaluyeh in 2007

MEG   500
DEG 50
TEG 4

 

Mobin Centralized Utility

Implemented by: Mobin Petrochemical Co.(Private Joint Stock)
Location:Pars Special Economic / Energy Zone
Area (Hectars):47
Ownership:100 % NPC
Starting date:2001
Anticipated production date: 2004

Product slate

Product Final Expansion

Electricity

740 MW

246 mw*

Steam

2130 t/h

660 t/h

Cooling water(from sea)

374,000 m3/h

70.000 m3/h

Potable Water

100 m3/h

 

Boiler Water

2,290

 

Fresh water

1,560 m3/h

312 m3/h

DM water

1,560 m3/h

 

Nitrogen

 48,000 m3/h

48.000 nm3/h*

Oxygen

156 t/h

156 t/h*

Assaluyeh Centralized Utility Expansion

Projected production date: 2011
* Came on stream & the steam unit will be operational in late 2010

 

Assaluyeh Centralized Utility Expansion

Implemented by:Damavand Petrochemical Co.(Private Joint Stock)
Ownership: NPC (100%)

Projected production date:Phase1 (2012), Phase 2 (2014)

Electricity 1,944 mw
Steam 3,540 t/h
Oxygen 900 t/h
Nitrogen 35,000 nm3/h
Instrument air 34,000 nm3/h
Service air 15,000 nm3/h
Fresh water 5,000 m3/h
DM water 3,000 m3/h
Cooling water 380,000 m3/h
Potable water 175 m3/h
Service water 250 m3/h

 

Venezuela Methanol JV 

Implemented by: Veniran Petrochemical Co.

Ownership: NPCI (49%), PIIC (1%), Venezuela
s Pequiven (49%), Venezuelas IPHL (1%)

Projected production date: 2014

Methanol   1,650

 

Indonesia ammonia/urea JV 

Implemented by: Hengam Petrochemical Co.

Location: Pars Special Economic/Energy Zone (Phase 2)
Area: 24 hectares
Ownership: NPCI (49%), PIIC (1%), Indonesia
s Pusri (50%)
Start date: 2010
Projected production date: 2014

  Inter-
mediate
Final
Ammonia 680 75
Urea    1,075

 

8th Ammonia/Urea jv

Implemented by: Lavan Petrochemical Co.

Ownership: NPCI (20%), Sab Industries (
India 53%), Arak Petrochemical Co. (20%),
Bank Melli Investment Co. (5%), Others (2%)

Projected production date: 2014

  Inter-
mediate
Final
Ammonia 660 175
Urea     860

 

7th Methanol

Implemented by: Marjan Petrochemical Co.

Ownership: Private Sector (100%)

Projected production date: 2012

Methanol   1,650

 

Oman ammonia/urea JV

Implemented by: Hormoz Petrochemical Co.

Ownership: NPCI (49%), PIIC (1%), Oman Oil Co. (50%)

Projected production date: 2014

  Inter-
mediate
Final
Ammonia 680 75
Urea    1,075

 

Parsphenol (privately owned company) (計画)

200,000 mt/year phenol-acetone

 

Iran/India JV (計画)

  JV National Iranian Petrochemical Company (NIPC)
     Indias Nagarjuna Fertilizers and Chemicals Limited Company (NFCL)

  立地 Pars Special Economic Energy Zone (second phase of Assaluyeh)

  能力 2,200 tons of urea per day
      3,860 tons of ammonia per day

  投資 400 million euro