National Petrochemical Company of Iran

http://www.irvl.net/IRAN23~1.HTM

NPC Public Relations; (prepared by Joint Ventures and International Affairs),
January 1995

Summary:

The purpose of this brochure is to provide a brief introduction to the National Petrochemical Company (NPC) of Iran. A summary of NPC's background is followed by an outline of its current status. The operating plants and complexes as well as the projects under construction are briefly described.

Text:

Company Profile

The initial step towards the development of the Iranian petrochemical industry goes back to 1963 when a fertilizer plant was installed in Shiraz (Southern Iran). Two years later in 1965, the NPC was established to undertake the operation and development of the petrochemical industry in Iran. Since then, through joint investments with internationally recognized companies, the NPC has established several petrochemical plants, which are operated by subsidiary companies, that produce various chemicals for both domestic and foreign markets.

NPC's major activities are focused on the manufacture, production, sale, distribution and export of commodities derived from hydrocarbons and related materials, both organic and inorganic. In order to reduce imports and promote exports, this company has conducted various projects within the First Five-Year Plan (1989-1994). In keeping with the country's policy of achieving a more active presence in world markets and breaking away from a single-export economy based on crude oil export, the petrochemical industry once again received significant attention in Iran's Second Five - Year Development Plan (1995 - 2000). Therefore, NPC is determined to gain further international recognition and keep pace with the rapid developments in foreign markets.

As a part of Petroleum Ministry, NPC is wholly owned by the Iranian government, and is administered by:

General Assembly

The General Assembly, as representative of shareholders, consists of the following members:

Board of directors

The Board of Directors, being responsible for the operation of the company, is an eight- member body, comprised of the following:

Fact and figures

1- Total Assets/End of 1993 2,727,356 Million Rials 2- Number of Employees/End of 1993 18,854 3- Investments in the First Five-Year Development Plan (1989-1994) Total 3,828,691 Million Rials Foreign Currency 2,572,246 Million Rials Local Currency 1,256,445 Million Rials 4- Investment in Development Projects 1,930,307 Million Rials (March 1993- March 1994) 5- Volume of Products (March 1993 - March 1994) Total 5.413 Million Tons Intermediate 1.290 Million Tons Final 4.123 Million Tons 6- Trade Volume of Domestic sales 2.071 Million Tons Value of Domestic sales 532,443 Million Rials Volume of Exports 1.953 Million Tons Value of Exports 185 Million Dollars

Subsidiary Companies

Company Year of Foundation

I- Companies in Charge of Operating Existing Plants & Complexes

1- Shiraz Petrochemical Company (SPC) 1960
2- Pazargad Chemical Company (PZCC) 1963
3- Kharg Petrochemical Company (KPC) 1967
4- Razi Petrochemical Company (RPC) 1967
5- Abadan Petrochemical Company (APC) 1969
6- Farabi Petrochemical company (FPC) 1973
7- Iran Carbon Company (ICC) 1976
8- Esfahan Petrochemical Company (EPC) 1989
9- Arak Petrochemical Company (ARPC) 1987
10- Bandar Imam Petrochemical Company(BIPC) 1989

II. Companies in Charge of Implementing Projects

1- Tabriz Petrochemical Company (TPC) 1989
2- Khorasan Petrochemical Company(KHPC) 1990

III - Other Companies

1. Erection & Construction Company (ECC) 1989 2- Petrochemical Non-Basic Operations and Services Co. (NBOSC) 1989 3- Petrochemical Commercial Company(PCC) 1990 4- NPC Europe Limited 1991 5- Petrochemical Investment Company (PIC) 1993

Complexes & Plants (Capacity : 1,000 tons/year)

Shiraz Petrochemical Complex

Ammonia

432

Urea

543

Nitric Acid

386

Ammonium Nitrate

254

L. Sodium Carbonate

80

D. Sodium Carbonate

51

Sodium Bicarbonate

30

Sodium Tripoly Phosphate

30

DAP

20

Methanol

84

Perchlorine

5

Razi Petrochemical Complex

Ammonia

660

Urea

726

Sulphur

508

Sulphuric Acid

627

Phosphoric Acid

255

DAP

450

Farabi Petrochemical Complex

DOP

40

Phthalic Anhydride

5.5

Esfahan Petrochemical Complex

Benzene

55.6

Toluene

20

O-xylene

22

P-xylene

44

Kharg Petrochemical Complex

Sulphur

198

Propane

66

Butane

54.5

Pentane

112

Iran Carbon Complex

Carbon Black 45

Pazargad Chemical Complex

(Abadan)

Caustic Soda 5.0
Hydrochloric Acid 5.9
Chlorine 4.4
Sodium Hypochlorite 8.6

(Shiraz)

Caustic Soda 22
Hydrochloric Acid 10
Chlorine 20
Sodium Hypochlorite 13

Abadan Petrochemical Complex

PVC 36
DDB 10
Caustic Soda 30
Chlor Gas 26.4
EDC 89

Arak Petrochemical Complex

H.D. Polyethylene 60
L.L.D. Polyethylene 60
Polypropylene 50
Pyrolysis Gasoline 102
Butene-1 7
Acetic Acid 30
Vinyl Acetate 30
Polybutadiene 25
2-Ethyl Hexanol 50
Ethylene Glycol 105
Ethanol Amines 30
Ethylene Oxide 110
n-Butanol 5
i-Butanol 5.7

Bandar Imam Petrochemical Complex

L.D. Polyethylene 100
H.D. Polyethylene 60
Polypropylene 50
SBR 40
Caustic Soda 250
VCM 175
PVC 175
EDC 300
Hydrochloric Acid 50
Pyrolysis Gasoline 130
LPG 1,900
Propylene 52
Benzene 260
Mixed Xylenes 210

Melamine Crystal Orumiyeh

Melamine Crystal 3
Ammonium Sulphate 9

Arak Butachlor Project

Alachlor 0.5
Butachlor 2.5
2,6 Diethyl Aniline 2.5
Monochloro Acetic Acid 10.5
Chloro Acetyl Chloride 1.5

Khorasan Petrochemical Complex

Ammonia 330
Urea 495

Tabriz Petrochemical Complex

LLDPE/HDPE 100
Polystyrene 80
SBR 23
SBL 15
Styrene (Surplus) 14
Propylene (Surplus) 56

These projects are still under construction where contractors for their implementation have already been selected and work is proceeding satisfactorily. Their physical progress ranges between 62.38% and 83.15%